Broward Blvd. Park & Ride Surrounding Roadways
Client: FDOT
Duration: 135 days
Completion: July 2015
To facilitate access into and out of the park & ride, this project added several turn lanes on the surrounding roadways, widened and re-paved the access roads, and installed a new drainage system for the existing parking lot.
Keeping the safety of the public in mind, a new lighting systems was added and all perimeter fencing replaced.

Installation of french drain system

Paved intersection

Installation of drainage system

Installation of french drain system