© 2017 by ENCO, LLC

  • LinkedIn - Grey Circle

Broward Blvd. Park & Ride Surrounding Roadways

Client: FDOT

Duration: 135 days

Completion: July 2015

To facilitate access into and out of the park & ride, this project added several turn lanes on the surrounding roadways, widened and re-paved the access roads,  and installed a new drainage system for the existing parking lot.

 

Keeping the safety of the public in mind, a new lighting systems was added and all perimeter fencing replaced.

 

BACK TO PROJECTS
Paved intersection

Paved intersection

Installation of drainage system

Installation of drainage system

Installation of french drain system

Installation of french drain system